Project
REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303
Client: NIGERIAN PIPELINE AND STORAGE COMPANY -NPSCStatus: Completed
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190611_120210_2-1.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190613_092625_3-1.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190610_160824_7-1.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190610_130941_6.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190610_112958_5.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190314_115509_0.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190306_082424_2.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190306_082508_3.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190315_161307_4.jpg)
![REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303](http://horkeyinternational.com/wp-content/uploads/2019/03/IMG_20190421_124330_9.jpg)
REHABILITATION OF DPK TANKS 201, 202 & 203 AND AGO TANKS 301, 302 AND 303 FOR NPSC YOLA DEPOT, YOLA, ADAMAWA STATE.
This rehabilitation involved the following sub-sectors;
- Sandblasting and re-coating of 6 tanks.
- Tank Seal replacement.
- Repair works, including servicing of sprinklers, foam dispenser system and maintenance of tanks hydrant line, pressure relief valves, reception/distribution gate valves, temperature indicator/gauges, tank lighting system including tracing any faults at junction box.
- Design and installation of Cathodic Protection system.
- Non Destructive testing.
- Lastly, Tank calibration.
This Project which was supposed to be a Six(6) Months contract was successfully concluded before the stipulated time.